Value increase of jetty project based on system dynamics
 
More details
Hide details
1
Universitas Mercu Buana, Department of Civil Engineering, Jakarta Barat 11650, Indonesia
 
 
Submission date: 2021-05-06
 
 
Final revision date: 2021-06-23
 
 
Acceptance date: 2021-06-24
 
 
Publication date: 2021-12-30
 
 
Archives of Civil Engineering 2021;67(4):487-496
 
KEYWORDS
TOPICS
ABSTRACT
Waste or additional costs in infrastructure projects such as jetty projects are often caused by rework. Besides having an impact on costs, rework is also a very significant contributor to waste or adding time which causes delays in the completion schedule of the project. A lot of research on rework has been carried out on both building and road construction projects, but there is no jetty construction project. This study aims to develop improvement scenarios to minimize the emergence of rework on pier infrastructure projects by modelling and simulating cost performance. The research variables were obtained based on the results of a literature study by asking for opinions from experts who are compatible in their scope. The initial model used the causal loop diagram form which was later developed into a Stock Flow Diagram, after which a repair simulation was carried out using the dynamic system method to determine the effect on cost performance. From the research results obtained 14 factors that affect the cost and time performance on the jetty project, the implementation of a dynamic system can provide the optimum solution with the ability to reduce the percentage of the number of reworks by 24.12% for 12 months.
eISSN:2300-3103
ISSN:1230-2945
Journals System - logo
Scroll to top