Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Zelazny Most
 
More details
Hide details
1
KGHM Polska Miedz S.A. Oddział Zakład Hydrotechniczny, Polkowicka 52, 59-305 Rudna
 
2
Wroclaw University of Technology, Faculty of Civil Engineering, Wybrzeze Wyspianskiego 27, 50-370 Wrocław, Poland
 
 
Submission date: 2021-08-12
 
 
Final revision date: 2021-08-23
 
 
Acceptance date: 2021-08-23
 
 
Publication date: 2022-06-30
 
 
Archives of Civil Engineering 2022;68(2):227-242
 
KEYWORDS
TOPICS
ABSTRACT
The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Zelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
eISSN:2300-3103
ISSN:1230-2945
Journals System - logo
Scroll to top