Skip to content

ACE

Archives of Civil Engineering

100 points on the list of MNiSW |

ACE

  • ABOUT US
  • GUIDELINES FOR AUTHORS
  • EDITORS
  • FULL TEXTS OR ABSTRACTS
  • REVIEWERS
Volume 61 (2015) 

Volume 61 – Issue 3

23 April 2020 admin

Analysis of dynamic replacement column construction process on neighbouring engineering structures


Feasibility of making concrete using lignite coal bottom ash as fine aggregate


Shear lag effect in the numerical experiment


Estimation of task completion times with the use of the PERT method on the example of a real construction project


Enterprise’s risk assessment of complex construction projects


Random and fuzzy measure of unpredictable construction works


Controlling partnering relations in construction operations using fuzzy reasoning


Technology selection for construction project, with the use of fuzzy preference relation


Shapes of energy-active segments of steel buildings


The evaluation of algorithms for determination of the reliability index


Buckling of the stiffened flange of the thin-walled member at longitudinal stress variation

  • ← Volume 61 – Issue 2
  • Volume 61 – Issue 4 →

All Volumes

  • Volume 68 (2022) (4)
  • Volume 67 (2021) (4)
  • Volume 66 (2020) (5)
  • Volume 65 (2019) (4)
  • Volume 64 (2018) (5)
  • Volume 63 (2017) (4)
  • Volume 62 (2016) (5)
  • Volume 61 (2015) (4)
  • Volume 60 (2014) (4)
  • Volume 59 (2013) (4)
  • Volume 58 (2012) (4)
  • Volume 57 (2011) (4)
  • Volume 56 (2010) (4)

About Us

Archives of Civil Engineering
Warsaw University of Technology
Faculty of Civil Engineering

Aleja Armii Ludowej 16, room 618
00-637 Warsaw, Poland

phone: 48 (22) 234 62 84
e-mail: ace.editor@pw.edu.pl

Menu

  • GUIDELINES FOR AUTHORS
  • EDITORS
  • SUBSCRIPTIONS
  • FULL TEXTS OR ABSTRACTS

Latest releases

  • Volume 67 (2021)
  • Volume 66 (2020)
  • Volume 65 (2018)
  • Volume 64 (2018)
  • Volume 63 (2017)
Copyright © 2023 ACE. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.